Moldence
MOLD ENGINEERING

Plastic Injection Mold Manufacturing

Manufacturing plastic injection molds according to project and production requirements.

Plastic Injection Mold Manufacturing

Manufacturing plastic injection molds according to project and production requirements.

MOLD ENGINEERING
  • 01Mold steels such as 1.2311, 1.2738, 1.2344, P20, H13 and S136 can be evaluated according to project needs.
  • 02The mold trial process can proceed through T1 sampling, evaluation, dimensional / conformity checks and, where needed, revision steps.
  • 03Revision, improvement and technical evaluation of existing molds can be carried out on a project basis.
  • 04Mold life must be assessed against material, part geometry, cycle conditions and the maintenance regime.
ACCEPTED FILE FORMATS
STEPSTPIGESIGSSTLParasolidSLDPRTPDFDWGDXFJPGPNGZIPRAR
PREPARATION CHECKLIST
  • 3D CAD file

    STEP, IGES, or native format (SolidWorks, NX)

  • Material specification

    Plastic type: PP, ABS, PA, POM, etc.

  • Annual production volume

    For mold steel selection and lifetime calculation

  • Surface finish requirements

    SPI finish class or custom texture request

  • Special form requirements

    Undercuts, threads, or side actions

  • DFM analysis scope

    Simulation and fill analysis expectations

FAQ

Frequently Asked Questions

What steels are used in mold manufacturing?
1.2311, 1.2738, 1.2344 (H13), and S136 can be evaluated based on project requirements, production volume, and part material. The right steel selection directly affects mold life and part surface quality.
Single-cavity or multi-cavity mold — how to decide?
The decision depends on production volume, cycle time, part size, and cost targets. Multi-cavity molds reduce unit cost in high-volume production, but require higher initial investment and precise balancing.
What is a T1 trial?
T1 is the first trial run after mold manufacturing is complete. It is used to verify part geometry, surface quality, and dimensional conformance. Required revisions are determined based on T1 results.
Can existing molds be revised?
Yes. Revisions arising from production issues, cavity addition for capacity increase, or geometry updates can be evaluated on a project basis.
Can a hot runner system be designed into the mold?
Yes. Hot runner system design and integration can be evaluated depending on project requirements and production volume.

Let's Evaluate Your Project Together

Share your technical requirements and we'll prepare a solution plan tailored for you.

Contact